BIM Augmented & Virtual Reality

Experience your projects in first-person

Building Information Modeling (BIM) simulates cost, safety and quality information by linking MS-Project, Primavera and BIM 3D model on 2D Based drawings using Augmented Reality. Further, using virtual reality technology, the stakeholders can experience all the aspects of any project in the first-person view as if they were there physically.

BIM can be viewed as a virtual process that encompasses all aspects, disciplines, and systems of a facility within a single, virtual model, allowing all design team members (owners, architects, engineers, contractors, subcontractors, and suppliers) to collaborate more accurately and efficiently than using traditional processes. As the model is being created, team members constantly refine and adjust their portions according to project specifications.

CPMPlanners develops BIM Augmented and Virtual Reality applications using state of the art technology that are beneficial to everyone at quiet low costs.

Design Benefits

  • Earlier Collaboration of multiple design disciplines by means of IPD
  • Earlier and more accurate visualizations of a design
  • Parametric Corrections when changes are made to design
  • Generation of Accurate and Consistent 2D Drawings at Any Stage of the Design
  • Easy Verification of Consistency to the Design Intent
  • Anytime extraction of Cost Estimates during the Design Stage
  • Improvement of Energy Efficiency and Sustainability

Fabrication Benefits

  • Use of Design Model as Basis for Fabricated Components
  • Quick Reaction to Design Changes
  • Discovery of Design Errors and Omissions before Construction
  • Synchronization of Design and Construction Planning
  • Better Implementation of Lean Construction Techniques
  • Synchronization of Procurement with Design and Construction

Pre-Construction Benefits

  • Concept, Feasibility, and Design Benefits

  • Increased Building Performance and Quality

  • Collaboration in the Team using Integrated Project Delivery

Pre-Construction Benefits

  • Improved commissioning and Handover of Facility Information

  • Improved management and operation of facilities

  • Integration with facility operation and management systems

  • Complete information about the building and its systems in one single file format.

Non-CPM based schedules consisting of open-end tasks always fail in Schedule Health Check & Integrity Tests due to which updating, monitoring and controlling becomes difficult subsequently making the Time Impact Analysis (TIA) for Extension of Time (EOT) claim, completely IMPOSSIBLE!

Get your schedules tested for FREE